Home > Exhibition > Content

Floor protection film is treated in detail before use

Sep 19, 2019

Before opening, it is best to measure the corners of the home and measure it yourself. Write down the pen ruler and mark it clearly. Identify the area involved in the decoration process, especially the tile area, wall paint area, wallpaper area, floor area; Wall size. Especially in the future, it is necessary to design the wall size of the furniture; the main body demolition is the first project, including the demolition, wall, shovel, demolition, plastic steel window, etc. Finished garbage should be cleaned up in time to ensure the cleanness of the room, also for the convenience of construction. At this time, the finished door should be fixed. At this time, it is best to go through the cabinets, range hoods, stoves, water heaters, and try to determine Down; hydropower transformation is the most important part, we must determine the exact location of switches, lamps, basins, bathtubs, washing machines, etc.

Before the hydropower transformation, the cabinet designer should go to the door for the first measurement to help you determine the power and waterway transformation plan. The water heater is also best to send people to design the power supply and water supply interface according to the model you have determined. Reminder: On the wall below the basin, it is best to leave the power socket for easy loading of the kitchen treasure. The air-conditioning hole and the power supply should be placed on the wall of the bed as much as possible to avoid the air conditioner directly blowing against the person. Strong electricity and weaknesses must be Keep a distance of 20 cm. For example, the distance between the socket and the network cable should be 20 cm. Considering the easy-to-wet environment of the kitchen and bathroom, the material of the riser must not be made of wood keel, even if the wooden keel is coated with anti-corrosion paint. It is best to use light steel keel, or red brick, light steel keel province, but the most solid and easy to use is red brick, then you need to buy ceramic tiles, grouting agent, etc. Furniture should be set early, keep the construction period At least 15 days or so, generally more than one month is better. Reminder: Do not cover the pipe with the inspection port, in case there is no reason to see through the water; after the wall paint is finished, the oil union is Need to smear the wallpaper, brush the lacquer, paint the next day Dry out, then you can post the wallpaper to the master.

Reminder: Do not open the window ventilation within 48 hours after the wallpaper is posted, let it dry slowly. If the individual is upturned, please help him to repair it. At this time, buy the panel, socket, and lighting. Then change it at home. New places, or new furniture for installation and placement, but be sure to pay attention to cleaning.

https://www.chamferingmachinechina.com/